Demolition of NRD-K Samsung Electronics Giheung Female Dormitory

  • Project scale: Approx. 3.96 billion KRW
  • Construction period: 6 months
  • Building scale: 5 low-rise buildings and 3 high-rise buildings.
  • Method: B/H lifting cranes, Top-down crushing, and long boom excavators.

Demolition of JP Tower Golf & Sauna Building

  • Project scale: Approx. 860 million KRW
  • Construction period: 3 months after commencement
  • Features: Demolition of light steel structures (prefabricated panels) and reinforced concrete structures.